08-07

2024


Treatment of Wet Flue Gas Desulfurization Wastewater from Coal-fired Power Plants and Various Self-owned Power Plants

The desulfurization wastewater treatment unit of the second phase of the original 1. of a power plant in Tianjin adopts the traditional process of "triple box clarifier". The failure rate of the system equipment is high, and the fluctuation of the effluent water quality brings great pressure to the operation adjustment and equipment maintenance of the zero discharge system of desulfurization wastewater. The operation rate of the zero discharge system of desulfurization wastewater is low.

08-07

2024


Petrochemical coal-fired unit flue gas wet desulfurization wastewater treatment

The original electrolytic aluminum flue gas desulfurization system is not equipped with desulfurization wastewater treatment system. The desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids and TDS in the desulfurization wastewater, the original sewage treatment system of the whole plant has a great impact.

08-07

2024


Iron and steel smelting sintering pellet flue gas wet desulfurization wastewater treatment

The desulfurization system of the original sintering plant is not equipped with desulfurization wastewater treatment system, and the desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids, high TDS content and serious excessive heavy metals, the original sewage treatment system of the whole plant has a great impact.

08-07

2024


Coal Mine Underground/Inoue Coal Containing Wastewater Treatment System

The water supply source of a project in Shanxi adopts the dredged water (high turbidity and low turbidity) from a coal mine in Yuanping. The main processes of the existing water purification station treatment system are two mechanical accelerated clarifiers, two integrated devices and three air scrubbing filters. The auxiliary process system includes dosing system, mud discharge system and backwashing system.

08-07

2024


Coal-containing Wastewater Treatment System in Power Plant

Original equipment: one set of chemical dosing system, one set of integrated coal water treatment equipment (processing capacity 8 tons/hour), and 7 water pumps.

03-28

2023


Tianjin Guotou Beijiang Power Plant Desulfurization Wastewater Integrated Treatment Technology Site Investigation Meeting Successfully Concluded

On March 23, 2023, the "Tianjin Guotou Beijiang Power Plant Desulfurization Wastewater Integrated Treatment Technology Site Inspection Meeting" hosted by Huade Creation Company was grandly held in Tianjin.

05-01

2024


Salute May Day: Huade Spirit Shines in Production Workshop and Project Site

However, colleagues in the engineering department and production department of Huade Creation Company are still busy in their respective jobs, composing the song of labor belonging to Huade people with sweat and wisdom.

08-07

2024


Coal Containing Wastewater Treatment System of Coal Handling Terminal and Coal Transfer Yard

A power plant in Guangdong Province currently has an installed capacity of 3 × 660MW units and is equipped with an open-air coal yard with an area of about 16000 ㎡. The coal-containing wastewater mainly comes from coal-containing wastewater collected from various transfer stations, coal docks, open-air coal yards and other sites in the coal transportation system. Which is located in the Pearl River estuary of Guangdong Province, the region has sufficient rainfall and high environmental pressure.

08-07

2024


Reservoir water, river, lake and other surface water used in industrial raw water treatment system

This project is a raw water and rain drainage treatment project supporting the annual output of 3.6 million tons of special aluminum new materials project, taking into account the supply of raw water for production after the whole plant is put into operation and the treatment and reuse of rainwater during the rainy period, which is an important guarantee for the normal production of the whole plant.

08-07

2024


Mine water for industrial raw water treatment system

The water supply source of a project in Shanxi adopts the dredged water (high turbidity and low turbidity) from a coal mine in Yuanping. The main processes of the existing water purification station treatment system are two mechanical accelerated clarifiers, two integrated devices and three air scrubbing filters. The auxiliary process system includes dosing system, mud discharge system and backwashing system.

< 123 >
HDCY

Get Quote



Please keep the phone unblocked, we will contact you as soon as possible, thank you for your support!