Treatment of Wet Flue Gas Desulfurization Wastewater from Coal-fired Power Plants and Various Self-owned Power Plants


The desulfurization wastewater treatment unit of the second phase of the original 1. of a power plant in Tianjin adopts the traditional process of "triple box clarifier". The failure rate of the system equipment is high, and the fluctuation of the effluent water quality brings great pressure to the operation adjustment and equipment maintenance of the zero discharge system of desulfurization wastewater. The operation rate of the zero discharge system of desulfurization wastewater is low.

Petrochemical coal-fired unit flue gas wet desulfurization wastewater treatment


The original electrolytic aluminum flue gas desulfurization system is not equipped with desulfurization wastewater treatment system. The desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids and TDS in the desulfurization wastewater, the original sewage treatment system of the whole plant has a great impact.

Iron and steel smelting sintering pellet flue gas wet desulfurization wastewater treatment


The desulfurization system of the original sintering plant is not equipped with desulfurization wastewater treatment system, and the desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids, high TDS content and serious excessive heavy metals, the original sewage treatment system of the whole plant has a great impact.

Coal Mine Underground/Inoue Coal Containing Wastewater Treatment System


The water supply source of a project in Shanxi adopts the dredged water (high turbidity and low turbidity) from a coal mine in Yuanping. The main processes of the existing water purification station treatment system are two mechanical accelerated clarifiers, two integrated devices and three air scrubbing filters. The auxiliary process system includes dosing system, mud discharge system and backwashing system.

Coal-containing Wastewater Treatment System in Power Plant


Original equipment: one set of chemical dosing system, one set of integrated coal water treatment equipment (processing capacity 8 tons/hour), and 7 water pumps.

Tianjin Guotou Beijiang Power Plant Desulfurization Wastewater Integrated Treatment Technology Site Investigation Meeting Successfully Concluded


On March 23, 2023, the "Tianjin Guotou Beijiang Power Plant Desulfurization Wastewater Integrated Treatment Technology Site Inspection Meeting" hosted by Huade Creation Company was grandly held in Tianjin.
HDCY

Get Quote



Please keep the phone unblocked, we will contact you as soon as possible, thank you for your support!