Pre-membrane Hardening Removal System

HDCY integrated multi-effect clarified effluent meets four types of surface water discharge


Abstract

In the second stage, the mine water, domestic sewage and tailings reservoir water are treated. The mine water, domestic sewage and tailings reservoir water are pumped to the backwater tank, and then pumped to the HDCY integrated multi-effect clarification system for pretreatment. After pretreatment, the clean water enters the reverse osmosis system, and the clean water is discharged after being treated by the reverse osmosis system.

 

In the second stage, mine water, domestic sewage and tailings reservoir water are treated. The mine water, domestic sewage and tailings reservoir water are pumped to the backwater tank, and then pumped to the HDCY integrated multi-effect clarification system for pretreatment. After pretreatment, the clean water enters the reverse osmosis system, and after being treated by the reverse osmosis system, the clean water is discharged out. The concentrated water of the reverse osmosis system and the bottom sediment of the HDCY integrated system return system are returned to the tailings reservoir.

 

 

recommend Reading


Treatment of Wet Flue Gas Desulfurization Wastewater from Coal-fired Power Plants and Various Self-owned Power Plants


The desulfurization wastewater treatment unit of the second phase of the original 1. of a power plant in Tianjin adopts the traditional process of "triple box clarifier". The failure rate of the system equipment is high, and the fluctuation of the effluent water quality brings great pressure to the operation adjustment and equipment maintenance of the zero discharge system of desulfurization wastewater. The operation rate of the zero discharge system of desulfurization wastewater is low.

Petrochemical coal-fired unit flue gas wet desulfurization wastewater treatment


The original electrolytic aluminum flue gas desulfurization system is not equipped with desulfurization wastewater treatment system. The desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids and TDS in the desulfurization wastewater, the original sewage treatment system of the whole plant has a great impact.

Iron and steel smelting sintering pellet flue gas wet desulfurization wastewater treatment


The desulfurization system of the original sintering plant is not equipped with desulfurization wastewater treatment system, and the desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids, high TDS content and serious excessive heavy metals, the original sewage treatment system of the whole plant has a great impact.

HDCY