Pre-membrane depth fluoride removal system

A Sludge Dewatering Project in Shandong


Abstract

The factory is located in Binzhou City, Shandong Province. At present, the concentration of fluoride before disposal is generally about 50-80mg/L for rain, sewage discharge, desulfurization and other wastewater in the factory area, and the original fluoride emission index is 30mg/L.
Project Background

The factory is located in Binzhou City, Shandong Province. At present, the concentration of fluoride before disposal is generally about 50-80mg/L for rain, sewage discharge, desulfurization and other wastewater in the factory area, and the original fluoride emission index is 30mg/L.

The basic process flow of the project: after the wastewater in all plant areas (rainwater, sewage 1800m/day, treated desulfurization wastewater 240m/day) is homogenized and adjusted, fluorine removal agent and other pharmaceutical reagents are added through pumps and reaction equipment (tank) to improve its settleability, realize mud-water separation, and clear water can be discharged or reuse up to the standard.

 

 

Equipment features

1. Rapid purification: the content of suspended solids can be controlled below 50ppm, and all kinds of suspended solids above colloidal state can be quickly coagulated and clarified

2. The equipment has good openness: flexibly adjust the dosage type of chemicals according to different treatment requirements, stabilize the treatment effect, and ensure the follow-up process and effluent index.

3, high efficiency and low consumption: save electricity consumption, drug consumption, reduce operating costs, fully automatic control, no special equipment, easy operation and maintenance.

4, mobile processing: compact system, flexible structure, small footprint, mobile processing can be used.

Customer pain points

It solves the problem that customers are repeatedly named or even fined by the Environmental Protection Bureau due to environmental protection failure.

Applicable industry

Deep removal of fluorine in electrolytic aluminum industry

• Core components and warranty period: 1 year

• Product size and weight:

• Equipment power (KW):45KW

• Equipment warranty: 168 stable operation after two years

• Productivity: 20 hours of continuous operation per day

recommend Reading


Treatment of Wet Flue Gas Desulfurization Wastewater from Coal-fired Power Plants and Various Self-owned Power Plants


The desulfurization wastewater treatment unit of the second phase of the original 1. of a power plant in Tianjin adopts the traditional process of "triple box clarifier". The failure rate of the system equipment is high, and the fluctuation of the effluent water quality brings great pressure to the operation adjustment and equipment maintenance of the zero discharge system of desulfurization wastewater. The operation rate of the zero discharge system of desulfurization wastewater is low.

Petrochemical coal-fired unit flue gas wet desulfurization wastewater treatment


The original electrolytic aluminum flue gas desulfurization system is not equipped with desulfurization wastewater treatment system. The desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids and TDS in the desulfurization wastewater, the original sewage treatment system of the whole plant has a great impact.

Iron and steel smelting sintering pellet flue gas wet desulfurization wastewater treatment


The desulfurization system of the original sintering plant is not equipped with desulfurization wastewater treatment system, and the desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids, high TDS content and serious excessive heavy metals, the original sewage treatment system of the whole plant has a great impact.

HDCY

Get Quote



Please keep the phone unblocked, we will contact you as soon as possible, thank you for your support!