Mine Gushing Water Treatment System for Phosphate Rock and Other Non-metallic Mine

Mine Water Treatment Project of a Phosphate Mine in Guizhou


Abstract

The wastewater treatment capacity of the project requires that the treatment water volume is ≥ 30000m/d, and the project is divided into two phases: phase I: 15000m/d and phase II: 15000m/d.

Processing capacity

The wastewater treatment capacity of the project requires that the treatment water volume is ≥ 30000m/d, and the project is divided into two phases: phase I: 15000m/d and phase II: 15000m/d.

Existing problems

Suspended solids, total phosphorus and some organic matter exceed the standard, and the amount of water is too large to meet the discharge standard.

Handling requirements

All indexes of the effluent after pit water treatment must meet the first-class standard of "Comprehensive Wastewater Discharge Standard" (GB8978-1996), "Notice on Implementation of Special Discharge Limits of Total Phosphorus for Water Pollutants from Phosphorus-related Enterprises in Guizhou Province" and "Discharge Standard of Environmental Pollutants in Guizhou Province" (DB52/864-2013).

Process flow

 

 

Real shot at the project site

 

 

recommend Reading


Treatment of Wet Flue Gas Desulfurization Wastewater from Coal-fired Power Plants and Various Self-owned Power Plants


The desulfurization wastewater treatment unit of the second phase of the original 1. of a power plant in Tianjin adopts the traditional process of "triple box clarifier". The failure rate of the system equipment is high, and the fluctuation of the effluent water quality brings great pressure to the operation adjustment and equipment maintenance of the zero discharge system of desulfurization wastewater. The operation rate of the zero discharge system of desulfurization wastewater is low.

Petrochemical coal-fired unit flue gas wet desulfurization wastewater treatment


The original electrolytic aluminum flue gas desulfurization system is not equipped with desulfurization wastewater treatment system. The desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids and TDS in the desulfurization wastewater, the original sewage treatment system of the whole plant has a great impact.

Iron and steel smelting sintering pellet flue gas wet desulfurization wastewater treatment


The desulfurization system of the original sintering plant is not equipped with desulfurization wastewater treatment system, and the desulfurization wastewater is discharged into the sewage treatment system of the whole plant after comprehensive treatment. Due to the high content of suspended solids, high TDS content and serious excessive heavy metals, the original sewage treatment system of the whole plant has a great impact.

HDCY

Get Quote